Sorry to be so long overdue with the posts. There hasn't been a lot of action in the kitchen, but we have had 2 days of cabinet door installs, today and a week ago Friday. Let's start with the first ones (all solid doors):
(To the right of the sink)
(In the baking area)
(Crown molding installed in this section)
(Left side of buffet)
(Right side of buffet)
And the second set installed today (all 8 glass doors)
(to the left of the sink, close up so you can see detail hopefully!)
(Above the wine & beer fridge)
(Left side of the buffet)
(Right side of buffet)