There's still a lot of work to do before the new floor can be laid... maybe toward the end of this week coming up?
Saturday, January 30, 2010
Kitchen Project Underway - Day 5
Not much excitement here Friday but the foyer is now ready for the new floor!
There's still a lot of work to do before the new floor can be laid... maybe toward the end of this week coming up?
There's still a lot of work to do before the new floor can be laid... maybe toward the end of this week coming up?
Thursday, January 28, 2010
Our Temporary Kitchen
Thought you might like to see how we've set up our temporary kitchen while the real one is under renovation. We have 3 stations (plus a table covered with miscellaneous stuff)
(microwave and blender for those ever-important after-school smoothies)
(water cooler (with hot water for tea and oatmeal) and toaster... can't live without bagels)

(and a little storage area with all our essentials)
Kitchen Project Underway - Day 4
Today we said goodbye to the tile in the foyer... with the help of some power equipment!
(getting underway)
(... hours later, complete!)
(even in the alcove)
We're about done with demo - only the carpet between the foyer and kitchen and the linoleum in the utility room/laundry room/pantry remain. After those jobs are complete, the prep work for the new flooring and the finish work on the new sheet rock are next!
(getting underway)
(... hours later, complete!)
(even in the alcove)
We're about done with demo - only the carpet between the foyer and kitchen and the linoleum in the utility room/laundry room/pantry remain. After those jobs are complete, the prep work for the new flooring and the finish work on the new sheet rock are next!
Wednesday, January 27, 2010
Kitchen Project Underway - Day 3
As promised, today was soffit day. The rest of it came down and all the new drywall went up. In other news, I found out today that all our scrap from the project goes to a big facility where it's sorted and recycled. How great is that?
(big view from day 3 - you can see our sink, dishwasher, fridge and now stove are all in working order, which is soooo nice!)
(close up)
(table and chairs back in their regular spot... for now)
Have I mentioned there is a serious echo in the room now? I'm sure having an actual floor in will mitigate that!
On tap for Thursday: ripping up the tile in the entryway. Hope that goes well. I think we're about a day behind (due to the soffit project; it would have been so much easier if there had been a full ceiling in the room!). The floor (material) is arriving tomorrow. It'll probably be Monday, maybe Tuesday before they can start to install it.
(big view from day 3 - you can see our sink, dishwasher, fridge and now stove are all in working order, which is soooo nice!)
(close up)
(table and chairs back in their regular spot... for now)
Have I mentioned there is a serious echo in the room now? I'm sure having an actual floor in will mitigate that!
On tap for Thursday: ripping up the tile in the entryway. Hope that goes well. I think we're about a day behind (due to the soffit project; it would have been so much easier if there had been a full ceiling in the room!). The floor (material) is arriving tomorrow. It'll probably be Monday, maybe Tuesday before they can start to install it.
Kitchen Project Underway - Day 2
lots of progress again Tuesday as (most of) the rest of the kitchen cabinets went out as well as the carpet in the space adjacent. The first section of soffit is down.
(the carpet is all gone! @bmds99 says "get excited!")
(and the cabinets are gone! that strip of dingy-looking wall is wallpaper lol)
(progress on removing the first section of the soffit - one side off)
(look you can see right up into the attic!)
(and here it is with that first section out... 1 down, 3 to go!)
Tomorrow the rest of the soffit comes down and sheet rock goes up to cover all the exposed places. Also on tap this week - goodbye to linoleum in backhall, tile in foyer and a small strip of carpet in hall between kitchen and foyer.
(the carpet is all gone! @bmds99 says "get excited!")
(and the cabinets are gone! that strip of dingy-looking wall is wallpaper lol)
(progress on removing the first section of the soffit - one side off)
(look you can see right up into the attic!)
(and here it is with that first section out... 1 down, 3 to go!)
Tomorrow the rest of the soffit comes down and sheet rock goes up to cover all the exposed places. Also on tap this week - goodbye to linoleum in backhall, tile in foyer and a small strip of carpet in hall between kitchen and foyer.
Tuesday, January 26, 2010
Countertop Thoughts Part 3
... of what seems to be a never ending saga!
We're on to 2 more potential manufacturers - Hanstone and LG Viatera. Not impressed with the LG website, the samples are tiny and lots of the links don't work. The Hanstone website is full of goodies though! Here are some of my favorites:
(not only do I like the way this counter looks (it's called Maple Canyon), I like the kitchen itself (maybe not the backsplash but the color of the cabinets and the floor (which you can see in the 2nd photo below)
(this one is really interesting (and yes I am working to let go of my disdain for their practice of giving all their colors double names... lol) Caribbean Blue
but so far have not seen CB on a counter... and in some pictures the base color looks really really orange. and last but not least - Coronado:
We're on to 2 more potential manufacturers - Hanstone and LG Viatera. Not impressed with the LG website, the samples are tiny and lots of the links don't work. The Hanstone website is full of goodies though! Here are some of my favorites:
(not only do I like the way this counter looks (it's called Maple Canyon), I like the kitchen itself (maybe not the backsplash but the color of the cabinets and the floor (which you can see in the 2nd photo below)
(this one is really interesting (and yes I am working to let go of my disdain for their practice of giving all their colors double names... lol) Caribbean Blue
but so far have not seen CB on a counter... and in some pictures the base color looks really really orange. and last but not least - Coronado:
Kitchen Project Underway - Day 1!
I was amazed how fast demo goes! The guys were here today for 3 hours and half our cabinets are out and all the tile (and the linoleum underneath the tile) is gone as well. We even had a few surprises...
(kitchen after demo day 1)
2nd surprise was we have two spots on the subfloor that are discolored, one looks like old water damage.
3rd surprise is that the linoleum in the pantry/utility/laundry room goes around the hot water heater, not under it! so we have to have it un-installed in order to put the new floor underneath it.
On tap for day 2 - out goes the carpet and we'll find out if the tile in the entryway comes up as easily as the kitchen tile...
(kitchen after demo day 1)
(same time, new angle)
(first of the surprises - this entire 12 foot long cabinet was all one piece!)2nd surprise was we have two spots on the subfloor that are discolored, one looks like old water damage.
3rd surprise is that the linoleum in the pantry/utility/laundry room goes around the hot water heater, not under it! so we have to have it un-installed in order to put the new floor underneath it.
On tap for day 2 - out goes the carpet and we'll find out if the tile in the entryway comes up as easily as the kitchen tile...
Subscribe to:
Posts (Atom)





















