Yes, it's true, the gas line is fully installed and functional. The cooktop is installed and everything passed inspection!
Showing posts with label gas. Show all posts
Showing posts with label gas. Show all posts
Tuesday, May 18, 2010
Friday, May 7, 2010
Half Way to Cooking with Gas
I feel like I should be singing Bon Jovi... I'll include them at the end, because we are half way there...
The guys came today and dug up the yard. Here's their big trailer for the equipment. They even brought sod to fix the sections of the lawn where the big holes were. First they made a deep hole out on the tree lawn (for those of you not from Cleveland, the tree lawn is that space between the sidewalk and the street).
Then they made 2 more holes just like it. This one where the front walk meets the driveway and the other where the meter will be, between the house and the driveway toward the back of the house.
The guys came today and dug up the yard. Here's their big trailer for the equipment. They even brought sod to fix the sections of the lawn where the big holes were. First they made a deep hole out on the tree lawn (for those of you not from Cleveland, the tree lawn is that space between the sidewalk and the street).
Then they made 2 more holes just like it. This one where the front walk meets the driveway and the other where the meter will be, between the house and the driveway toward the back of the house.
They bored through the soil from hole to hole which meant we didn't have a big 4 foot deep trench through the whole yard. They were here when Thomas and I left for school at 7:45 and finished about noon.
Next we need a meter. The pipe comes up out of the ground and is capped there. Then the gas plumber will come and run the pipes in the house and install the new cooktop! Can't wait to be "cooking with gas."
Friday, April 30, 2010
Kitchen Progress...
This week's progress so far. We'll have more to share this evening (or at least that's the plan!).
Sunday, we installed our new disposal and hooked up all the pipes under the sink. Monday the beverage fridge arrived! Here it is just out of the box:
Also on Monday, Dylan installed the new faucet:
Wow it's nice having running water in the kitchen. Read more about the faucet in this previous post. I have to share that it is awesome and totally works as advertised. It's like magic to just touch the faucet and have the water come on!
Wednesday the electricians came and hooked up the double oven:
Right now the oven is sitting on a temporary box while we decide if it's at the right height. And right now it's perfect for me - the display panel is right at my eye level - but we think it'll look nicer (and still be easy to work / not up too high) if we raise it up 3-4 inches. That'll also put it more in line with the top of the fridge. This whole section will have cabinetry built around it. That's the last part that'll be built.
So far I'm really pleased with the oven, and Thomas loves it. As it preheats it shows the temperature inside the oven on the display... he loves to watch the numbers go up. Even the inside is pretty:
Crazy that it's blue, huh? Little things make me happy. :)
While the electricians were here they also hooked up the outlet for the beverage fridge:
And now it lights up all pretty inside. And chills the beer and wine. It's a victory!
Also on Wednesday afternoon the guys from the city came by and marked up the yard for our gas line.
Soon we'll be cooking with gas!
Today (Friday) we'll get the last of the cabinets... next week doors and drawers... stay tuned!
Sunday, we installed our new disposal and hooked up all the pipes under the sink. Monday the beverage fridge arrived! Here it is just out of the box:
Also on Monday, Dylan installed the new faucet:
Wow it's nice having running water in the kitchen. Read more about the faucet in this previous post. I have to share that it is awesome and totally works as advertised. It's like magic to just touch the faucet and have the water come on!
Wednesday the electricians came and hooked up the double oven:
Right now the oven is sitting on a temporary box while we decide if it's at the right height. And right now it's perfect for me - the display panel is right at my eye level - but we think it'll look nicer (and still be easy to work / not up too high) if we raise it up 3-4 inches. That'll also put it more in line with the top of the fridge. This whole section will have cabinetry built around it. That's the last part that'll be built.
So far I'm really pleased with the oven, and Thomas loves it. As it preheats it shows the temperature inside the oven on the display... he loves to watch the numbers go up. Even the inside is pretty:
Crazy that it's blue, huh? Little things make me happy. :)
While the electricians were here they also hooked up the outlet for the beverage fridge:
And now it lights up all pretty inside. And chills the beer and wine. It's a victory!
Also on Wednesday afternoon the guys from the city came by and marked up the yard for our gas line.
Soon we'll be cooking with gas!
Today (Friday) we'll get the last of the cabinets... next week doors and drawers... stay tuned!
Subscribe to:
Posts (Atom)








